Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
彩票平台
Grand-Lisboa-admin@hgoconfecciones.com
Grand-Lisboa-admin@hgoconfecciones.com
芬狄诗
澳门博彩官网
新葡新京
Casinos-in-Macau-admin@endesacuerdotv.com
Casinos-in-Macau-admin@endesacuerdotv.com
The-biggest-bookmaker-info@nellysliang.com
The-biggest-bookmaker-info@nellysliang.com
Lottery-platform-hr@fs-huaxiang.com
365体育
澳门英皇赌城
Maya动画资源网
兆久成
美图WEB开放平台
乐搜
多维度
均胜电子
重庆交通大学招生就业信息网